4 Beersma B, Hollenbeck J R, Humphrey S E, et al. Cooperation, competition, and team performance: Toward a contingency approach[J]. The Academy of Management Journal,2003, 46(5): 572-590.
5 Blount S, Janicik G A. When Plans Change: Examining how people evaluate timing changes in work organizations[J]. Academy of Management Review,2001, 26(4): 566-585.
DOI:
10.5465/amr.2001.5393892
6 Bluedorn A C, Jaussi K S. Leaders, followers, and time[J]. The Leadership Quarterly,2008, 19(6): 654-668.
DOI:
10.1016/j.leaqua.2008.09.006
7 Brewer M B. In-group bias in the minimal intergroup situation: A cognitive-motivational analysis[J]. Psychological Bulletin,1979, 86(2): 307-324.
DOI:
10.1037/0033-2909.86.2.307
8 Chartrand T L, Lakin J L. The antecedents and consequences of human behavioral mimicry[J]. Annual Review of Psychology,2013, 64(1): 285-308.
DOI:
10.1146/annurev-psych-113011-143754
9 Chong D S F, Van Eerde W, Chai K H, et al. A double-edged sword: The effects of challenge and hindrance time pressure on new product development teams[J]. IEEE Transactions on Engineering Management,2011, 58(1): 71-86.
DOI:
10.1109/TEM.2010.2048914
10 Edmondson A C, Higgins M, Singer S, et al. Understanding psychological safety in health care and education organizations: A comparative perspective[J]. Research in Human Development,2016, 13(1): 65-83.
DOI:
10.1080/15427609.2016.1141280
12 Espinosa J A, Lerch J, Kraut R. Explicit vs. implicit coordination mechanisms and task dependencies: One size does not fit all[A]. Fiore S M, Cannon-Bowers J A. Team cognition: Process and performance at the inter- and intra-individual level eduardo salas [M]. Washington, DC: American Psychological Association, 2004.
15 Guenter H, Van Emmerik I H, Schreurs B. The negative effects of delays in information exchange: Looking at workplace relationships from an affective events perspective[J]. Human Resource Management Review,2014, 24(4): 283-298.
DOI:
10.1016/j.hrmr.2014.02.001
16 Halbesleben J R B, Novicevic M M, Harvey M G, et al. Awareness of temporal complexity in leadership of creativity and innovation: A competency-based model[J]. The Leadership Quarterly,2003, 14(4-5): 433-454.
DOI:
10.1016/S1048-9843(03)00046-8
17 Hochschild A, Irwin N, Ptashne M. Repressor structure and the mechanism of positive control[J]. Cell,1983, 32(2): 319-325.
DOI:
10.1016/0092-8674(83)90451-8
18 Jansen K J, Kristof-Brown A L. Marching to the beat of a different drummer: Examining the impact of pacing congruence[J]. Organizational Behavior and Human Decision Processes,2005, 97(2): 93-105.
DOI:
10.1016/j.obhdp.2005.03.005
19 Kahneman D, Tversky A. Prospect theory: An analysis of decision under risk[J]. Econometrica,1979, 47(2): 263-291.
DOI:
10.2307/1914185
20 Klimoski R, Mohammed S. Team mental model: Construct or metaphor?[J]. Journal of Management,1994, 20(2): 403-437.
DOI:
10.1177/014920639402000206
21 Koch S, Holland R W, Van Knippenberg A. Regulating cognitive control through approach-avoidance motor actions[J]. Cognition,2008, 109(1): 133-142.
DOI:
10.1016/j.cognition.2008.07.014
22 Leroy S, Shipp A J, Blount S, et al. Synchrony preference: Why some people go with the flow and some don’t[J]. Personnel Psychology,2015, 68(4): 759-809.
DOI:
10.1111/peps.12093
23 Lientz B, Rea K. Breakthrough technology project management[M]. 2nd ed. New York: Routledge, 2016.
24 Massey A P, Montoya-Weiss M M, Hung Y T. Because time matters: Temporal coordination in global virtual project teams[J]. Journal of Management Information Systems,2003, 19(4): 129-155.
DOI:
10.1080/07421222.2003.11045742
25 McGrath J E. Time, interaction, and performance(TIP): A theory of groups[J]. Small Group Research,1991, 22(2): 147-174.
DOI:
10.1177/1046496491222001
26 Menon S, Narayanan L, Spector P E. Time urgency and its relation to occupational stressors and health outcomes for health care professionals[A]. Spielberger C D, Sarason I G. Stress and emotion. Washington DC: Taylor & Francis, 1996.
27 Mohammed S, Alipour K K. It’s time for temporal leadership: Individual, dyadic, team, and organizational effects[J]. Industrial and Organizational Psychology,2014, 7(2): 178-182.
DOI:
10.1111/iops.12128
28 Mohammed S, Angell L C. Surface- and deep-level diversity in workgroups: Examining the moderating effects of team orientation and team process on relationship conflict[J]. Journal of Organizational Behavior,2004, 25(8): 1015-1039.
DOI:
10.1002/job.293
29 Mohammed S, Harrison D A. The clocks that time us are not the same: A theory of temporal diversity, task characteristics, and performance in teams[J]. Organizational behavior and human decision processes,2013, 122(2): 244-256.
DOI:
10.1016/j.obhdp.2013.08.004
30 Mohammed S, Nadkarni S. Temporal diversity and team performance: The moderating role of team temporal leadership[J]. Academy of Management Journal,2011, 54(3): 489-508.
DOI:
10.5465/amj.2011.61967991
31 Moore, W. E. Man, time and society[M]. New York: Wiley, 1963.
33 Mumford M D, Gustafson S B. Creativity syndrome: Integration, application, and innovation[J]. Psychological Bulletin,1988, 103(1): 27-43.
DOI:
10.1037/0033-2909.103.1.27
34 Nrico R, Nchez-Manzanares M S, Gil F, et al. Team implicit coordination processes: A team knowledge - based approach[J]. Academy of Management Review,2008, 33(1): 163-184.
DOI:
10.5465/amr.2008.27751276
35 Okada E M, Hoch S J. Spending time versus spending money[J]. Journal of Consumer Research,2004, 31(2): 313-323.
DOI:
10.1086/422110
36 Osgood C E, Tannenbaum P H. The principle of congruity in the prediction of attitude change[J]. Psychological Review,1955, 62(1): 42-55.
DOI:
10.1037/h0048153
37 Party V, Streiff R, Marin-Cudraz T, et al. Group synchrony and alternation as an emergent property: Elaborate chorus structure in a bushcricket is an incidental by-product of female preference for leading calls[J]. Behavioral Ecology and Sociobiology,2015, 69(12): 1957-1973.
DOI:
10.1007/s00265-015-2008-8
38 Rajagopal P, Rha J Y. The mental accounting of time[J]. Journal of Economic Psychology,2009, 30(5): 772-781.
DOI:
10.1016/j.joep.2009.06.008
39 Rastegary H, Landy F J. The interactions among time urgency, uncertainty, and time pressure[A]. Svenson O, Maule A J. Time pressure and stress in human judgment and decision making[M]. Boston, MA: Springer, 1993: 217-239.
41 Shamir B. Leadership takes time: Some implications of(not)taking time seriously in leadership research[J]. The Leadership Quarterly,2011, 22(2): 307-315.
DOI:
10.1016/j.leaqua.2011.02.006
43 Tice D M, Bratslavsky E. Giving in to feel good: The place of emotion regulation in the context of general self-control[J]. Psychological Inquiry,2000, 11(3): 149-159.
DOI:
10.1207/S15327965PLI1103_03
44 Treisman M. Temporal discrimination and the indifference interval. Implications for a model of the " internal clock”[J]. Psychological Monographs: General and Applied,1963, 77(13): 1-31.
DOI:
10.1037/h0093864
45 Volk S, Pearsall M J, Christian M S, et al. Chronotype diversity in teams: Toward a theory of team energetic asynchrony[J]. Academy of Management Review,2017, 42(4): 683-702.
DOI:
10.5465/amr.2015.0185
46 Waller M J, Conte J M, Gibson C B, et al. The effect of individual perceptions of deadlines on team performance[J]. Academy of Management Review,2001, 26(4): 586-600.
DOI:
10.5465/amr.2001.5393894
47 West Ⅲ G P, Meyer G D. Temporal dimensions of opportunistic change in technology-based ventures[J]. Entrepreneurship Theory and Practice,1998, 22(2): 31-52.
DOI:
10.1177/104225879802200204
48 Zerubavel E. Hidden rhythms: Schedules and calendars in social life[M]. Chicago: University of Chicago Press, 1981.